Audet & Knight participated in the construction of some mine shafts at the Bracemac-McLeod of Mattagami mine. The project consisted of installing 2 verticals concreate cylinder. The cylinders were installed at the depth of 24 metres.
The project was done in 2011 and its goal was to build surface foundations worth of 1000 metric tons.